DIII-D RESEARCH OPPORTUNITIES FORUM FOR THE 2019 EXPERIMENTAL CAMPAIGN
Public Summary List
|
Direct Submit
log-in
|
Submit Request
|
Print
You are not logged in.
Click here to log in for more options
.
To reset your password,
click here
.
2018 ROF Ideas:
Click here for ROF 2018 submissions
Author
(full last name only)
:
Keyword:
Click here for internal detailed listing
Below is a public summary listing:
ID
Title
Research Area
Name
Affiliation
Time
Req'ed
Presentation
ITPA
Joint Exp
ITER IO Urgent
Research Task
235
Physics of real-time wall conditioning by B dust injection
Materials Migration and Mitigation
Bortolon
PPPL
No
Breakout
No
No
238
Mapping the Super H-mode Boundary and Bifurcation
Core-Edge Integration Task Force incorporating Thrust: Core-Edge Scenario Optimization
Bortolon
PPPL
Yes
Breakout
No
No
258
Deuterium lifecycle during ELM pacing with pellet injection
Pedestal Physics and Pedestal Structure & QH Thrust
Bortolon
PPPL
No
Breakout
No
No
259
Divertor to pedestal trace impurity transport
Div/SOL Turbulence and transport
Bortolon
PPPL
No
Breakout
No
No
260
Wide pedestal QH-mode at low Zeff through real-time boronization
Core-Edge Integration Task Force incorporating Thrust: Core-Edge Scenario Optimization
Bortolon
PPPL
Yes
Breakout
No
No
278
A Boron-Nitrogen radiative divertor for AT scenarios
Core-Edge Integration Task Force incorporating Thrust: Core-Edge Scenario Optimization
Bortolon
PPPL
No
Breakout
No
No
316
A Boron-Nitrogen radiative divertor for AT scenarios
Core-Edge Integration Task Force incorporating Thrust: Core-Edge Scenario Optimization
Bortolon
PPPL
No
Breakout
No
No
356
ELM pacing by pellet injection in low-collisionality ITER relevant scenarios
ELM Control
Bortolon
PPPL
No
Breakout
No
No
393
ELM pacing by pellet injection in low-collisionality ITER relevant scenarios
ELM Control
Bortolon
PPPL
No
Breakout
No
No
394
ELM pacing during ITER-like current ramp-up/down
ELM Control
Bortolon
PPPL
No
Breakout
No
Yes
395
ELM pacing during ITER-like current ramp-up/down
ELM Control
Bortolon
PPPL
No
Breakout
No
Yes
537
ELM pacing during ITER-like current ramp-up/down
ELM Control
Bortolon
PPPL
No
Breakout
No
Yes
554
ELM pacing during ITER-like current ramp-up/down
ELM Control
Bortolon
PPPL
No
Breakout
No
Yes