DIII-D RESEARCH OPPORTUNITIES FORUM FOR THE 2013 EXPERIMENTAL CAMPAIGN
Review | Direct submission with log-in | Request submission without log-in
For website assistance, please contact the Webmaster |
Title | 140: q0 control with Counter-ECCD in ITER Baseline Discharges | ||
Name: | Masanori Murakami masanori_murakami@att.com | Affiliation: | Retired |
Research Area: | Inductive Scenarios | Presentation time: | Not requested |
Co-Author(s): | P.M. Ryan, S.J. Diem, J.M. Park, R. Prater, G. Jackson, et al. | ITPA Joint Experiment : | No |
Description: | Performance of counter EC for H and CD is compared with radial-launch EC and counter-FWCD in ITER Baseline discharges.
This could be a basis of ITER Baseline discharge simulations with ECCD using the theory-based transport models and ITER H&CD systems Detailed pedestal documentation |
ITER IO Urgent Research Task : | No |
Experimental Approach/Plan: | Using Counter-EC and radial-launch EC
Modulation fast (~30Hz) and slow(5Hz) EC power for FFT analysis J.M. Park, | ||
Background: | ITER still plans to use counter-ECCD to make configuration control in particular, q(0) control to supplement ICRF (FWCD) or off-axis NBCD.
H&CD performance of the counter-EC need to be studied for control and research plans. This also gives us opportunity of comparing with FW experiments in DIII-D last year. | ||
Resource Requirements: | NBI: >5 co-beams + 210RT
EC: >=5 gyrotrons | ||
Diagnostic Requirements: | ECE, MSE, CER, TS | ||
Analysis Requirements: | -- | ||
Other Requirements: | -- |