DIII-D RESEARCH OPPORTUNITIES FORUM FOR THE 2013 EXPERIMENTAL CAMPAIGN Review | Direct submission with log-in | Request submission without log-in

For website assistance, please contact the Webmaster
Questions about ROF? Contact Max Fenstermacher


Print this page
Title 140: q0 control with Counter-ECCD in ITER Baseline Discharges
Name:Masanori Murakami masanori_murakami@att.com Affiliation:Retired
Research Area:Inductive Scenarios Presentation time: Not requested
Co-Author(s): P.M. Ryan, S.J. Diem, J.M. Park, R. Prater, G. Jackson, et al. ITPA Joint Experiment : No
Description: Performance of counter EC for H and CD is compared with radial-launch EC and counter-FWCD in ITER Baseline discharges.
This could be a basis of ITER Baseline discharge simulations with ECCD using the theory-based transport models and ITER H&CD systems
Detailed pedestal documentation
ITER IO Urgent Research Task : No
Experimental Approach/Plan: Using Counter-EC and radial-launch EC
Modulation fast (~30Hz) and slow(5Hz) EC power for FFT analysis
J.M. Park,
Background: ITER still plans to use counter-ECCD to make configuration control in particular, q(0) control to supplement ICRF (FWCD) or off-axis NBCD.
H&CD performance of the counter-EC need to be studied for control and research plans.
This also gives us opportunity of comparing with FW experiments in DIII-D last year.
Resource Requirements: NBI: >5 co-beams + 210RT
EC: >=5 gyrotrons
Diagnostic Requirements: ECE, MSE, CER, TS
Analysis Requirements: --
Other Requirements: --