DIII-D RESEARCH OPPORTUNITIES FORUM FOR THE 2008 EXPERIMENTAL CAMPAIGN
Login | Review | Submit | Logout | Help
Questions about this website? Contact Andrew LeBlanc | ||||||||||||||||||||||||||||||||||||||||||||
| Title | 313: Extend full noninductive, high performance operation | ||
| Name: | Masanori Murakami ( |
Affiliation: | Oak Ridge National Laboratory |
| Research Area: | Core Integration (Steady-State Scenario) | Presentation time: | Requested | Co-Author(s): | T. Luce, J. Ferron, JM Park, C. Greenfield, E. Doyle, et al. |
| Description: | Extend 100% noninductive, high performance for 2*tauR (~4s) | ||
| Experimental Approach/Plan: | 1) Start with 129830
2) Bring the start of the high power phase earlier to optimize q-profile and save NB energy 3) Work on PCS control of substituting the low power phase NB power with EC and FW heating power to save NB for high power phase 4) DND operation if we encounter beta limit problem | ||
| Background: | |||
| Resource Requirements: | Machine Time: 2 days
Number of gyrotrons: >4 Number of neutral beam sources: 7 | ||
| Diagnostic Requirements: | Fast ion diagnostic (UC, Irvine), MSE(LLNL), edge reflectometer (UCLA) | ||
| Analysis Requirements: | |||
| Other Requirements: | fast wave (both 60 and 100 MHz) | ||